0:02 In My Labs, open Import to build a lab from a network diagram. 0:09 Choose PlantUML Diagram and select your supported PlantUML file. 0:19 Give this imported lab a name that you can recognize. 0:25 Open the new lab and check both routers and their connecting cable. 0:32 Review the chosen devices because diagram labels can map to different models. 0:41 The imported diagram supplies a topology, so the router interfaces still need configuration. 0:54 On the first router, set an address on the connected interface and enable it. 1:10 Configure the second router on the same network. 1:19 Check that the connected interface now has an address and is up. 1:26 Ping the second router, repeating the test after initial address resolution if needed. 1:35 Five successful replies confirm that the configured link is working. 1:53 Save the device configurations before leaving this lab. 2:00 In My Labs, export a Visio file from the lab row menu. 2:10 Open Import again and choose Visio File to load the downloaded diagram. 2:20 Give the Visio copy a different name to keep the original easy to find. 2:29 Open the Visio copy and check the devices and cable again. 2:37 Diagram import does not restore the router settings, so configure the new copy separately. 2:52 Review any Visio import warnings before opening a more complex diagram. 2:59 This warning identifies a connector whose endpoint could not be imported. 3:05 Keep the original diagram and verify the imported topology before you start configuring.