Wire a spine and leaf topology with Connection Builder.

00:00:10.000 --> 00:00:15.000
Open Bulk wiring to view the available patterns.

00:00:18.200 --> 00:00:24.700
Choose the spine and leaf pattern and add both spine switches.

00:00:29.150 --> 00:00:33.650
Assign the other four switches as leaves.

00:00:37.400 --> 00:00:43.900
Preview the eight links and check the ports at both ends.

00:00:45.950 --> 00:00:51.450
Apply the reviewed links to add all eight cables.

00:00:53.900 --> 00:00:58.900
Close Connection Builder to see the complete topology.

00:01:08.550 --> 00:01:15.100
To discard a different proposal, close the builder without applying it.

00:01:19.700 --> 00:01:26.700
Reload the lab and confirm the same eight links are still there.