WEBVTT

1
00:00:00.100 --> 00:00:08.100
Three Cisco routers form the lab, with the middle router carrying the underlay traffic.

2
00:00:16.800 --> 00:00:23.800
Verify that the far tunnel endpoint is reachable through the physical network.

3
00:00:41.650 --> 00:00:49.650
Configure a GRE tunnel on each edge router using its loopback as the source.

4
00:00:57.450 --> 00:01:04.950
Check that the tunnel is up and that the overlay route uses it.

5
00:01:05.850 --> 00:01:12.850
Ping the far tunnel address to verify that traffic crosses the overlay.

6
00:01:23.850 --> 00:01:31.850
Shut down the far side of the transit router to break the underlay path.

7
00:01:40.300 --> 00:01:45.350
Both the endpoint and the overlay become unreachable.

8
00:02:03.550 --> 00:02:11.550
Restore the transit link and verify that the endpoint and overlay are reachable again.
