IoT · Episode 04 · 1:37

Run and reset a Factory Cell scenario

Run a Factory Cell scenario, pause and resume its timeline, inspect the scheduled controller alarm, and reset the changes owned by that run.

English narration and on-screen explanations. Read the narration transcript.

Chapters and transcript times will be ready shortly. You can use the video’s Play control or open the MP4 below.

Chapters
Open MP4 · Download transcript · English captions

Narration transcript

The English narration in this video. Select a time to watch that moment.

  1. This Factory Cell combines a programmable controller, sensors and industrial network devices.

  2. Open IoT Operations and use Plant to find the devices in the cell.

  3. The Scenario player lists each timeline, its current state and its next event.

  4. Start the bearing failure scenario and watch its progress begin.

  5. Pause holds this scenario timeline; independent live signals can continue changing.

  6. Resume continues the same run from its paused point.

  7. After the scheduled delay, the bearing fault tag becomes true while the conveyor control stays unchanged.

  8. Done means the final step has run; inspect the result before resetting.

  9. Reset returns the scenario to idle and restores the changes owned by that run.

  10. Check the controller tags again after reset, and use a separate lab copy for experiments.