Home Video tutorials Preview and apply bulk wiring with Connection Builder Labs · Episode 47 · 1:27
Preview and apply bulk wiring with Connection Builder Use Connection Builder to wire two spines to four leaves. Review the proposed ports, add eight cables, and confirm they are still there after reloading the lab.
English narration and on-screen explanations. Read the narration transcript .
Your browser cannot play this video. Open the MP4 .Chapters and transcript times will be ready shortly. You can use the video’s Play control or open the MP4 below.
Chapters 0:00 Review the prepared switches 0:10 Open Bulk wiring and assign roles 0:37 Preview the ports 0:45 Apply eight links 1:08 Discard an unapplied proposal 1:19 Verify the saved topology Open MP4 ·
Download transcript ·
English captions Narration transcript The English narration in this video. Select a time to watch that moment.
0:00 Wire a spine and leaf topology with Connection Builder.
0:10 Open Bulk wiring to view the available patterns.
0:18 Choose the spine and leaf pattern and add both spine switches.
0:29 Assign the other four switches as leaves.
0:37 Preview the eight links and check the ports at both ends.
0:45 Apply the reviewed links to add all eight cables.
0:53 Close Connection Builder to see the complete topology.
1:08 To discard a different proposal, close the builder without applying it.
1:19 Reload the lab and confirm the same eight links are still there.
Back to all Labs videos